Estimating Contacts
For all Preconstruction Inquiries, Questions, Proposals, and to be added to our Bidder’s List please email bidmaster@reedergeneral.com
Current Bids
Dallas ISD Skyline High School – Additions and Renovations
Maintenance Scope:
- Installation of new infrastructure to support the updating of security equipment, including cameras, card readers, door contractors, weapon management systems, campus wide. The infrastructure would include:
i. Conduit and boxes for cabling.
ii. New Doors and Door Hardware as required for the new controls
- Replace and Add new Exterior Light Fixtures including the controls for the fixtures. These fixtures include:
i. Replace Existing Wall Packs
ii. Replace Existing Canopy Soffit Type Light Fixtures with new LEDs
iii. Replace Heads on Existing Light Poles with new LED fixtures and paint the poles.
iv. Install new Light Poles and Heads West of the Competition Gym for dark areas on site.
- Replace the 60’ wide Aviation Door in Building A1. Would include all new hardware and railings.
Additions Scope:
- An addition of a new Field House (Building D3) attached to building F1. The facility will house:
i. i. Football Locker rooms.
ii. ii. General Locker room.
iii. Training Facility
iv. iv. Weight Room
v. Coaches’ offices
vi. The new building is also to be used as one of two storm shelters.
- An addition to building MB3 for a new Performing Arts Wing (Building MB5) housing:
i. Orchestra
ii. Orchestra Room
iii. Orchestra Practice Rooms
iv. Orchestra Ensemble Room
v. Orchestra Office
vi. Orchestra Library
vii. Choir
viii. Choir Room
ix. Choir Practice rooms
x. Choir Office
xi. Choir Library
xii. Choir Work Room
xiii. Student and Staff Toilets
xiv. Access to a new drive and loading dock.xv. Facility will also be the other Storm Shelter
Renovation Scope:
- Development of a Secure Entry adjacent to the front of the Auditorium in building MB4.
- Renovation of the existing Band and Choir (building D3) will be renovated for:
i. Band Offices
ii. Band Hall
iii. Band Library
iv. Band Work Room
v. Band Equipment Storage
vi. Piano Storage
vii. Doors between the shop and the doors to the Theater Stage for direct scene movement
viii. Band practice room enhancements.
ix. Access to the dock for material loading.
- Resurfacing the existing corridors walls with new ceramic tiles buildings B, G, MB1, MB2, and MB3.
i. Includes removal of some lockers
- Renovation of a set of existing student toilet rooms in building MB3.
Alternates include:
Alternate 1 - Replacement of the curtain wall at the front of the Auditorium
Alternate 2 - Replacement of fencing around the aviation storage, which includes visual screening.
Alternate 3 - Power washing of the building’s exterior.
Alternate 4 – Building Edge Lighting
Alternate 5 - Renovation of the existing weight room in Building D2 for:
i. Baseball Locker Rooms
ii. Softball Locker Rooms
iii. Soccer Locker rooms
iv. Coaches’ Offices
v. Storage
vi. Vestibules to the exterior.
vii. Connects with Basketball and Volleyball locker rooms
All questions must be submitted via email to bidmaster@reedergeneral.com BEFORE 5:00 pm on Friday, October 3rd, 2025.



